SSRSSR Crest Engineers
and Constructions

Special class contractors · Road construction

We build the highways, bridges and rail crossings the country runs on.

Twenty-six years of national and state highway work out of Hyderabad — highways, bridges, and rail over- and under-bridges delivered on time, every time.

01 — The company

A special class road contractor, profit-making since 1999.

Established in 1999 and operating out of Hyderabad, SSR Crest is a special class road construction contractor working with National Highways and State Highways across India. The company has executed more than ₹2,000 crore of highway work and holds a current order book of ₹170 crore, with a presence in Telangana, Karnataka, Nagaland and Rajasthan.

1999

Established

200+

Projects delivered

2,000 Cr

Value executed

800 Cr

Total bid capacity

Figures as stated in the company profile. Current order book ₹170 Cr; eligible single work ₹400 Cr.

How we buildKm 02 · Capability
Asphalt batch mix plant owned and operated by SSR Crest
Two asphalt batch mix plants, including the first Apollo ANP 2000 erected in Mahabubnagar district.

04 — Capability

Around 80 machines, owned outright rather than hired.

Around 80 machines are owned outright rather than hired — which is what lets the company hold schedule on remote packages and price aggressively on long corridors.

  • Aggregate in-house. Two 200 TPH stationary crushers and a 160 TPH mobile crusher remove dependence on third-party quarries.
  • Bitumen in-house. Two asphalt batch mix plants, including the first Apollo ANP 2000 erected in Mahabubnagar district.
  • Tracked in real time. GPS / GPRS on vehicles and machinery, with diesel data pushed to head office as it happens.

What we build

Six things this company does, and nothing it does not.

Roads, the structures that carry them, and the plant that supplies them — from award through to long-term maintenance.

EPC

Highway EPC

National and State Highway packages, awarded and delivered end to end.

BR

Bridges and structures

High level bridges and cross-drainage structures inside highway packages.

ROB

Rail ROB / RUB

Railway over-bridges and under-bridges as a special class contractor.

OPRC

Maintenance

Long-duration State Highway maintenance under World Bank programmes.

TPH

Crushing and batching

Owned aggregate and bitumen production feeding our own corridors.

HAM

HAM and PPP

The award formats the pipeline is moving towards.

All capabilities

05 — Selected work

Projects executed

More than 200 projects since 1999, across four states — including the ₹250 Cr, 72 km NH-163 package in Telangana.

06 — History

Company milestones

Twenty-six years, from a first-year turnover of ₹7 crore to EPC packages of ₹250 crore — and a stated route to the public markets.

1999

Operations begin

SSR Crest Engineers and Constructions is established and starts work.

2000–03

₹7 Cr to ₹36 Cr

Turnover grows from ₹7 crore in the first year to ₹36 crore by the third.

2008

New leadership

The initial partners exit. Mr. Ch. Pavan Reddy takes over and sets a strategy for scaling operations significantly.

2009

World Bank work begins

Mr. Naveen returns from the USA and joins as Director. New projects are established in Mahbubnagar district, notably the World Bank–funded OPRC P-9.

2012

P24 and P25 awarded

Two further World Bank projects taken on, of roughly ₹40 crore each.

2014–24

Into the national tier

Three EPC projects delivered — ₹65 Cr, ₹185 Cr and ₹250 Cr — moving the company into the group of major contractors operating across the nation.

2025–26

Private investment

Plan to secure significant private investment to scale operations and diversify the offering.

2027

Public markets

Plan to raise capital through the public markets, reaching financial stability and sustained growth for all stakeholders.

FY 2030

₹3,000 Cr bid capacity

With the balance sheet in place, the company can tender for single packages of up to ₹1,200 Cr — three times today’s ceiling.

Scroll to travel the timeline · 1999 → FY 2030

03 — The market

Why now

India runs the second largest road network in the world, and the build-out is accelerating. The projects coming to tender are exactly the EPC, HAM and PPP formats SSR Crest already delivers — the constraint on capturing them is balance sheet, not capability.

₹2.76 Lakh Cr

Central Government’s continuing commitment to infrastructure projects — roughly US $33 billion, with roads taking the largest share.

1.46 Lakh km

Existing national highway network, the second largest road system in the world after the United States.

20,000+ km

New national highway construction planned over the next two years, on top of ongoing widening and maintenance contracts.

9,000+ km

Greenfield expressways planned — long, high-value corridors suited to contractors with owned plant and batching capacity.

The growth plan
National HighwaysR&B TelanganaPanchayat RajTSIICTribal WelfarePublic HealthIrrigationTSPSCAPSPHCAPEWIDCVSP

The ask

With private equity or debt, bid capacity rises from ₹800 Cr to ₹3,000 Cr by FY 2030.

Read the growth plan